Eikenott, Gland, Switzerland

  • Yapı Tipi:
  • Konut Binaları
  • Otoparklar
Tam Ekran Kapat Sokak Görüntüsü

Peikko provided an efficient construction method for Eikonott Gland. Speed and technically advanced details convinced the total contractor Losinger-Marazzi to use Peikko's Column Connection solution. Solution consisted of HPKM®-Column Shoes and HPM® Anchor Bolts which were used in oval shape columns. 

Peikko's Column Shoes were helpful in speeding up the whole construction process. Now building seems almost like a LEGO-game.

Bertrand Faucherre, Didier Bourqui

Proje Bilgileri

Proje Boyutu:
20 000 m2
Kat Adedi:
4
Yapımcı Firma:
Losinger-Marazzi
Prekast Firması:
Bétontec
Teslim Tarihi:
2012
Tamamlanma Tarihi:
2014