Pralong RTE Electric Station, Embrun, France

  • Yapı Tipi:
  • Enerji Yapıları
Tam Ekran Kapat Sokak Görüntüsü

This 225000/63000V substation is part of the renovation program of the high durability electric transmission network.

PETRA® slab hangers are being utilized so that the honeycombed tiles can be laid swiftly without having to be supported.

 

Architectual visualisations © Mrs. Agnès Canu, for RTE project management, the ITEA project manager.

A quick installation with no need for supports to create slab hangers.

Mr Mehira, Chef de chantier.

Proje Bilgileri

Yatırımcı:
RTE
Yapımcı Firma:
STAM
Yapısal Tasarımcı:
RTE
Mimar:
ITEA. Mme Agnès CANU
Prekast Firması:
KP1
Teslim Tarihi:
2020