Sallerupskolan, Eslöv, Sweden

  • Yapı Tipi:
  • Eğitim ve Kültür
Tam Ekran Kapat

New Sallerup School in Eslöv: A Modern School Project with Peikko frame solution

The new Sallerup School in Eslöv is being built to replace the existing school, which was in dire need of modernization after more than 40 years in operation. The new building will cover 6,300 square meters and be spread over two floors, with a new schoolyard. The school is planned to be ready in autumn 2025.

For Peikko, this has been a big project that includes DELTABEAM® Frame, a solution that combines DELTABEAM® composite beams with ATLANT® composite columns. In total, 360 meters of DELTABEAM® and 169 ATLANT® columns have been delivered to create a durable and flexible frame structure for the school. In addition, a large amount of other steel and beams have been supplied by Peikko, further contributing to the project's construction.

This project is an example of how modern engineering solutions can help create safe and functional educational environments for the future.

Devamını Oku down-arrow.png

Proje Bilgileri

Proje Boyutu:
6300 m2
Yapımcı Firma:
MVB
Yapısal Tasarımcı:
Soliber
Mimar:
Kamikaze Arkitekter
Prekast Firması:
Starka
Teslim Tarihi:
2024
Tamamlanma Tarihi:
2025

Bize Ulaşın